22-52 New JMB Building
Project Overview:
This project includes the renovation of the Grounds Department building, an existing
pre-engineered metal building and a new addition. Exterior renovations include new
masonry/metal panel cladding and new windows/doors. Interior renovations to include
practice and rehearsal rooms, storage and offices for the Jaguar Marching Band. The
addition will be a full ensemble rehearsal hall and will be constructed of structural
steel framing and metal stud walls with masonry/metal panel cladding. An artificial
practice field will also be constructed. The adjacent existing university storm shelter
will be connected by an enclosed vestibule between the two buildings. New Addition
includes a Rehearsal Space and Fire Sprinkloset. Siteities and modifications to the
existing parking lot is included in t
Client: University of South Alabama Health
Construction Contract: $8,622,106
SF: 2,564 sf of renovations and 507 sf of infill addition
Primary Use: Marching band practice facility
Design Contract: Stacy Norman Architects
Construction Contract: Persons Services Corp.
Target Timeline:
Bid Date: September 24, 2024
Start Construction: November 11, 2024
Construction Completion Date: January 2026